Skip to content
Cart 0

Cancel or Change an Order

Last updated:

You can cancel a Birth Bud order, or change it, within 24 hours of placing it. That covers the things people most often wake up worried about: a name spelled wrong, a grandchild left off the list, the wrong size hoodie, an old address. This page explains how the 24 hours are counted, exactly what to put in your email, what can be changed, and what your choices are once the window has closed.

Cancelling and changing at a glance

  • The window: 24 hours from the moment you place the order.
  • How: email support@birthbud.shop with your order number. We are email only.
  • What can change: names, months, flower choice, the ribbon line, stem count, size, colour, product and shipping address.
  • No proof is sent: nothing is emailed for approval before printing, so this window is your one chance to correct an order before it is made.
  • Cancelled orders: refunded to the payment method you used.
  • After 24 hours: write to us anyway. If the order can no longer be changed, you can return it within 60 days of delivery with a free return label.

1. How the 24 hours are counted

The clock starts when your order is placed, which is the time on your confirmation email. It runs for 24 hours straight, through nights and weekends.

An order placed at 9:10 on a Tuesday evening can be cancelled or changed until 9:10 on Wednesday evening. An order placed at noon on Saturday can be changed until noon on Sunday.

What matters is when your email reaches us, not when we answer it. We reply within 24 hours on business days, so a message sent on a Saturday night may not be answered until Monday. If it arrived inside your window, it counts. Send it as soon as you notice the problem and do not wait for a quieter moment.

2. Why the window is short

Each bouquet is made to order. There is no stock of sweatshirts with your eight grandchildren already on them, so making begins soon after the order comes in, and it takes 1–3 business days in all.

There is also no proof. We do not email a drawing and wait for you to approve it. The checking happens before you pay: as you type, the product page draws the bouquet and reads each stem back as name, month and flower. You tick a box that says “I have checked every name and month”. After that, we print exactly what was typed: the spelling, the capitals and the order.

The 24 hours are a second look. Read your confirmation email the next morning with rested eyes, or pass your phone to someone who knows how your nephew spells his name.

A two-minute check for the morning after

Open the confirmation email and go down this list. It catches nearly everything people write to us about.

  • Count the lines. Is every person there? Count the grandchildren by household, not from memory: your sister’s three, your brother’s two, your own three. Eight.
  • Read each name letter by letter. The ones that go wrong are the ones you know best. Micheal for Michael. Kaitlyn for Katelyn. A nickname where the full name was meant.
  • Check each month against a birthday you can picture. Was she born at the end of April or the start of May? April is daisy or sweet pea; May is lily of the valley or hawthorn.
  • Look at the flower choice. First flower of each month, second flower, or a flower you noted beside a name. If your sister asked for sweet pea, is it there?
  • Read the ribbon line. It is optional and holds up to 28 characters. Check the apostrophe in a family name.
  • Check the size and colour of any garment, and the size of a mug, pillow, poster or canvas.
  • Read the shipping address, above all if the gift is going straight to her and not to you.

If everything matches, you are done. If one thing is off, the next section tells you what to send.

3. How to ask

  1. Find your order number in the confirmation email.
  2. Write to support@birthbud.shop from the email address you ordered with. The Submit a Ticket page has links with the subject line already filled in.
  3. Start the subject with one word: “Cancel” or “Change”, then the order number.
  4. For a cancellation, say whether you want the whole order cancelled or one item from it.
  5. For a change, be exact. Tell us what it says now and what it should say. If names are involved, send the full corrected list, one person per line, the same way you typed it on the product page.
  6. Wait for our written reply. A change or cancellation is done when we confirm it by email, not before.

A clear change request looks like this:

  • Subject: Change, order 1234
  • Item: Family Bouquet Mug, 15 oz, 5 stems
  • Now reads: Micheal, March
  • Should read: Michael, March
  • Everything else stays the same.

We print what you send in that email, letter for letter. Check it the way you would check the product page.

4. What can be changed

Changes we can make within 24 hours of ordering
What you want to change What to send us Things to know
The spelling of a name The name as printed now and the name as it should be Names can be up to 14 letters each. Capitals are printed as you type them.
A birth month The person’s name and the correct month The flower changes with the month. Moving Ada from August to September swaps her gladiolus for an aster.
Which flower is drawn First flower of each month, second flower of each month, or a flower noted beside a name An April sister who wants sweet pea and not daisy can have it; say so next to her name.
The order of the names The full list in the order you want Stems are arranged in the order typed.
The line on the ribbon The new wording, or “remove it” Up to 28 characters. The ribbon line is optional.
The number of stems The full new list of names and months Each product has a maximum; see section 5. The price may differ.
Garment size or colour The new size or colour Adult sizes run S to 5XL. 2XL and 3XL cost $2 more; 4XL and 5XL cost $4 more.
Mug, pillow, poster or canvas size; frame colour The new option The 8×10 in poster fits up to 6 stems.
The product itself The product you want and its options The price may differ.
The shipping address The complete new address We ship to the United States, Canada, Australia and New Zealand only.
Removing one item Which item to take off The rest of the order carries on.

Single Stem products have no names, so the changes there are the month and, where there is one, the size. Twelve Months products are set designs with no personalisation; you can change the size where sizes are offered, or cancel.

5. Adding or removing a stem

The most common change after a typo is a missing person. You counted the grandchildren on your fingers and got seven, and at breakfast someone said “what about Theo?”.

Inside the 24 hours, send us the full list with Theo on it. Before you do, check that the product can hold the new count:

  • Family Bouquet Mug: up to 6 stems.
  • Family Bouquet Tote Bag: up to 8 stems.
  • Family Bouquet Hoodie: up to 10 stems.
  • Tee, Crewneck Sweatshirt, Throw Pillow, Throw Blanket, Poster, Canvas and Framed Poster: up to 12 stems. The 8×10 in poster fits up to 6.

If the eighth name will not fit, the product has to change as well. A grandmother with eight grandchildren cannot have them all on a mug, which stops at six. A tote bag, a sweatshirt or a pillow would hold them. Tell us which you would like in place of the mug.

Taking a name off works the same way in reverse. Send the full list as it should be printed, and check whether the smaller count still suits the product you chose. A posy of two or three stems, a bunch of four or five, a bouquet of six to eight and an armful of nine to twelve are drawn to suit their size, so the drawing on the product page for your new count is the one to look at.

Two people born in the same month are not a mistake and do not need correcting. Twins born in September are drawn as two asters, each with its own name.

6. When a change alters the price

Some changes cost nothing: a corrected letter, a different month, a new address. Others move the price up or down, such as a larger size band, a different stem count, or a different product.

If the new total is higher, we tell you the difference in our reply and nothing is made until you have agreed. If it is lower, the difference is refunded to the payment method you used. If you would rather not deal with a difference at all, you can cancel the order within the window and place a new one.

7. Once the 24 hours have passed

After the window, your order is at the bench or on its way there, and we cannot promise a change. Write to us anyway, straight away, with the order number and what is wrong. We will tell you honestly what is still possible.

If it is too late, you are not stuck with it. Every product, personalised or not, can be returned within 60 days of delivery, and we pay the return postage with a free return label. So the route is:

  1. Let the order arrive.
  2. Email us to start a return, as set out in the Returns & Exchanges Policy.
  3. Ask for a refund, store credit or an exchange with the corrected names.

The refund is sent within 7 days of receiving the return. Details are in the Refund Policy.

8. If the order has already shipped

When you have had the email with tracking details, the parcel is out of our hands and cannot be cancelled or reprinted on the way. If the address is wrong, email us at once with the order number and the right address and we will help with whatever can still be done. Otherwise, wait for delivery and use the 60-day return.

You can check where things stand on the Order Tracking page.

9. Your money after a cancellation

An order cancelled within 24 hours is refunded in full to the payment method you used at checkout. Shipping was free, so there is nothing else to work out. We confirm the cancellation and the refund in the same email. How quickly it shows on your statement depends on your bank or payment provider.

If you cancel one item from a cart of several, only that item is refunded. Say you ordered a twelve-stem blanket for your mother and a six-stem mug for your mother-in-law, then learned your sister had bought the same mug. Cancel the mug inside the window; the blanket carries on.

10. The family grew after the order arrived

This is not a change to an order; it is a new one. If a baby arrives in June, six months after Grandma opened her eight-stem sweatshirt, order the same product one stem bigger with the new name and “June” on its own line. It is a new order at the normal price. There is no upgrade or trade-in scheme for an older bouquet.

The same goes for a stem for someone who has died, added later. It is typed like any other name and month.

11. Contact

Email support@birthbud.shop and put the order number in the subject. We reply within 24 hours on business days. For delivery estimates see Shipping & Delivery; for common questions see the FAQs.

Birth Bud, 3838 Walnut Avenue, Concord, CA 94519, US.